Search Results for: 2

Program Management

Integrated Master Plan (IMP)

The Integrated Master Plan (IMP) is an event-based, top-level plan consisting of a hierarchy of Program Events.  Each event is decomposed into specific accomplishments and each specific accomplishment is decomposed into specific Criteria.  The IMP is ultimately used to develop a time-based Integrated Master Schedule (IMS) to show a networked, multi-layered schedule showing all the

Program Management

Integrated Master Plan (IMP) Read More »

Software Management

Software Development Process

The Software Development Process is the structured approach to developing software for a system or project, sometimes called the Software Development Life Cycle (SDLC). There are several approaches (see Software Development Approaches) that can be used, including waterfall, spiral, and incremental development. These different approaches will focus the testing effort at different points in the

Software Management

Software Development Process Read More »

Systems Engineering

Systems Engineering Process

The Systems Engineering Process is a comprehensive, iterative, and recursive problem-solving process, applied sequentially top-down by integrated teams. It transforms needs and requirements into a set of system product and process descriptions, generates information for decision-makers, and provides input for the next level of development. The process is applied sequentially, one level at a time,

Systems Engineering

Systems Engineering Process Read More »

Test & Evaluation

Test and Evaluation Master Plan (TEMP)

The Test and Evaluation Master Plan (TEMP) describes an acquisition program’s planned Test and Evaluation (T&E) activities over a program’s life-cycle and identifies evaluation criteria for the testers. It serves as an executive summary and provides a framework within which to generate detailed T&E plans and document schedule and resource implications associated with the T&E

Test & Evaluation

Test and Evaluation Master Plan (TEMP) Read More »

Production, Quality & Manufacturing

Continuous Improvement Process

The Continuous Improvement Process (CIP) is an ongoing effort to enhance the quality of products, services, or processes through small changes. It involves implementing minor iterative modifications that accumulate into substantial outcomes by intentionally examining existing procedures. The six-step systematic approach entails planning, sequencing, and implementing improvement activities based on data. It further expands on

Production, Quality & Manufacturing

Continuous Improvement Process Read More »

Software Management

Software Development Plan (SDP)

The Software Development Plan (SDP) describes a developer’s plans for conducting a software development effort. The SDP provides the acquirer insight and a tool for monitoring the processes to be followed for software development. It also details methods and approaches for each activity, organization, and resource. It helps ensure that software development is done systematically

Software Management

Software Development Plan (SDP) Read More »

Systems Engineering

Systems Engineering Plan (SEP)

The Systems Engineering Plan (SEP) is a living document that details the execution, management, and control of the technical aspects of an acquisition program from conception to disposal. The SEP outlines how the systems engineering process is applied and tailored to meet objectives for each acquisition phase. The SEP captures a program’s current and evolving

Systems Engineering

Systems Engineering Plan (SEP) Read More »

Program Management

Integrated Master Schedule (IMS)

The Integrated Master Schedule (IMS) is a time-based schedule containing the networked, detailed tasks necessary to ensure successful program/contract execution. The IMS is traceable to the Integrated Master Plan (IMP), Work Breakdown Structure (WBS), Statement of Work (SOW), Contractor Performance Report (CPR), and Earn Value Management system (EVMS). Definition: The Integrated Master Schedule (IMS) is

Program Management

Integrated Master Schedule (IMS) Read More »