Search Results for: 2

Major Reviews

Initial Technical Review (ITR)

The Initial Technical Review (ITR) is a multi-disciplined technical review to support a program’s initial Program Objective Memorandum (POM) submission in the Materiel Solutions Analysis (MSA) Phase . This review ensures a program’s Technical Baseline is sufficiently rigorous to support a valid cost estimate and enable an independent assessment. The ITR assesses the capability needs […]

Major Reviews

Initial Technical Review (ITR) Read More »

Major Reviews

Functional Configuration Audit (FCA)

A Functional Configuration Audit (FCA) examines the functional characteristics of the configured product. It verifies that the product has met the requirements specified in its Functional Baseline documentation approved at the Preliminary Design Review (PDR) and Critical Design Review (CDR).   The FCA reviews the configuration item’s test and analysis data to validate that the intended

Major Reviews

Functional Configuration Audit (FCA) Read More »

Major Reviews

Integrated Baseline Review (IBR)

  An Integrated Baseline Review (IBR) (FAR 34.202)is a joint assessment conducted by the government Program Manager (PM) and the contractor to establish a mutual understanding of the Performance Measurement Baseline (PMB). This understanding provides for an agreement on a plan of action to evaluate the risks inherent in the PMB and the management processes

Major Reviews

Integrated Baseline Review (IBR) Read More »

Major Reviews

System Verification Review (SVR)

  The System Verification Review (SVR) is a product and process assessment to ensure the system under review can proceed into Low-Rate Initial Production (LRIP) and Full-Rate Production (FRP) within cost, schedule, risk, and other system constraints during the Engineering, Manufacturing and Development (EMD) Phase.  It assesses the system functionality and determines if it meets

Major Reviews

System Verification Review (SVR) Read More »

Major Reviews

Preliminary Design Review (PDR)

The Preliminary Design Review (PDR) is a technical assessment that establishes the Allocated Baseline of a system to ensure a system is operationally effective.  A PDR is conducted before the start of detailed design work and is the first opportunity for the Government to observe the Contractor’s hardware and software design closely.  This review assesses

Major Reviews

Preliminary Design Review (PDR) Read More »

Major Reviews

Critical Design Review (CDR)

A Critical Design Review (CDR) is a multi-disciplined independent technical assessment to ensure that a system can proceed into fabrication, demonstration, and test and meet stated performance requirements within cost, schedule, and risk.  A successful CDR is predicated upon a determination that the detailed design satisfies the Capabilities Development Document (CDD).  Multiple CDRs may be

Major Reviews

Critical Design Review (CDR) Read More »

Major Reviews

Operational Test Readiness Review (OTRR)

  The Operational Test Readiness Review (OTRR) assess if a system should proceed into Initial Operational Test and Evaluation (IOT&E). The review addresses and verifies system reliability, maintainability, and supportability performance and determines if the hazards and Environmental, Safety, Occupational and Health (ESOH) residual risks are manageable within the planned testing operations.  This assessment determines

Major Reviews

Operational Test Readiness Review (OTRR) Read More »

Purchasing & Small Business

Small Business Technology Transfer (STTR) Program – Overview

The purpose of Small Business Technology Transfer (STTR) and Small Business Innovation Research (SBIR) program is to harness the innovative talents of our nation’s small technology companies for U.S. military and economic strength. STTR’s most important role is to bridge the gap between performance of basic science and commercialization of resulting innovations. Definition: The Small

Purchasing & Small Business

Small Business Technology Transfer (STTR) Program – Overview Read More »

Major Reviews

Alternative Systems Review (ASR)

  An Alternative Systems Review (ASR) is a technical review that assesses the preliminary materiel solutions that have been developed during the Materiel Solution Analysis (MSA) Phase.  The review ensures that one or more proposed materiel solution(s) have the best potential to be cost-effective, affordable, operationally effective, and suitable, and can be developed to provide

Major Reviews

Alternative Systems Review (ASR) Read More »