Search Results for: 2

Technology Development

Defense Science Board (DSB)

The Defense Science Board (DSB) provides the Secretary of Defense, the Deputy Secretary of Defense, the Under Secretary of Defense for Acquisition, Technology, and Logistics, the Chairman of the Joint Chiefs of Staff and, as requested, other Office of the Secretary of Defense (OSD) Principal Staff Assistants, the Secretaries of the Military Departments, the Commanders […]

Technology Development

Defense Science Board (DSB) Read More »

Technology Development

Independent Research & Development

Independent Research & Development (IR&D) is a technical research and development effort by industry that is not sponsored by or required in the performance of a contract.  It consists of projects within (1) Basic Research and (2) Applied Research & Development, (3) Development, and (4) System and other concept formulation studies. Contractors can recover a

Technology Development

Independent Research & Development Read More »

Technology Development

Advanced Technology Demonstration

An Advanced Technology Demonstration (ATD) is a demonstration of the maturity and potential of advanced technologies for enhanced military operational capability or cost-effectiveness. They may provide early insights into available technologies for incorporation into developmental or mature, post-prototype systems. ATDs are identified, sponsored, and funded by Services and agencies. They follow Advanced Technology Development. [1]

Technology Development

Advanced Technology Demonstration Read More »

Technology Development

Technology Readiness Assessment (TRA)

A Technology Readiness Assessment (TRA) (Title 10 U.S.C. § 2366b) is a formal, metrics-based process and accompanying report that assesses the maturity of critical hardware and software technologies called Critical Technology Elements (CTE) to be used in systems. It is conducted by an Independent Review Team (IRT) of subject matter experts (SMEs). All DoD acquisition

Technology Development

Technology Readiness Assessment (TRA) Read More »

Major Reviews

System Functional Review (SFR)

The System Functional Review (SFR) is a technical review to ensure that the system’s functional baseline is established and can satisfy the requirements of the Initial Capabilities Document (ICD) or draft Capability Development Document (CDD) within the currently allocated budget and schedule. It also determines whether the system’s lower-level performance requirements are fully defined and

Major Reviews

System Functional Review (SFR) Read More »

Major Reviews

System Requirements Review (SRR)

A System Requirements Review (SRR) is a formal review conducted to ensure that system requirements have been completely and properly identified and that a mutual understanding exists between the government and the contractor. It ensures that the system under review can proceed into initial systems development and that all system and performance requirements derived from

Major Reviews

System Requirements Review (SRR) Read More »

Acquisition Process

In-Service Review

The In-Service Review (ISR) is an assessment of a system to determine if it’s operationally employed with well-understood and Managed Risks. It assesses the current status, operational health and corrective actions to satisfy user operational needs based on user feedback and performance metrics. The reviews should be conducted at defined intervals to identify needed revisions

Acquisition Process

In-Service Review Read More »

Major Reviews

Physical Configuration Audit (PCA)

The Physical Configuration Audit (PCA) examines the actual configuration of an item being produced and is conducted around the time of the Full-Rate Production Decision. It verifies that the related design documentation matches the Configuration Item (CI) as specified in the contract and confirms that the manufacturing processes, quality control system, measurement, and test equipment,

Major Reviews

Physical Configuration Audit (PCA) Read More »

Major Reviews

Post-Deployment Review (PDR)

A Post-Deployment Review (PDR) is used by a Program Manager (PM) to review a system, beginning at Initial Operational Capability (IOC), to verify whether the fielded system continues to meet or exceed thresholds and objectives for cost, performance, and support parameters approved at full-rate production. DoD policy requires that “The Services shall conduct periodic assessments

Major Reviews

Post-Deployment Review (PDR) Read More »