Search Results for: 2

JCIDS Process

Military Utility Assessment (MUA)

A Military Utility Assessment (MUA) is an assessment of the operational utility of a system.  It’s completed at the end of a Joint Capability Technology Demonstration (JCTD) and may be a suitable replacement for the required analysis used in a Initial Capability Document (ICD). MUAs that do not contain the critical elements of information presented […]

JCIDS Process

Military Utility Assessment (MUA) Read More »

Acquisition Process

Major Automated Information System (MAIS)

A Major Automated Information System (MAIS) is a defense acquisition program for an Automated Information System (AIS) that meets Acquisition Category (ACAT) IA requirements listed below.  An AIS is a system of computer hardware, computer software, data, and/or telecommunications that performs functions such as collecting, processing, storing, transmitting, and displaying information. A MAIS is determined

Acquisition Process

Major Automated Information System (MAIS) Read More »

Acquisition Process

Low-Rate Initial Production (LRIP)

The Low-Rate Initial Production (LRIP) is conducted during the Production and Deployment (PD) Phase.  LRIP is the point in time where manufacturing development is completed and the ability to produce a small-quantity set of articles to provide for representation at Initial Operational Test and Evaluation (IOT&E).  It also establishes an initial production base and sets

Acquisition Process

Low-Rate Initial Production (LRIP) Read More »

PPBE Process

Program Budget Accounting System (PBAS)

The Program Budget Accounting System (PBAS) is used by the DoD to control and distribute funds from the department level to the Defense Finance Accounting Service (DFAS) field sites. PBAS performs the funds distribution electronically by allowing the user to create the funding documents on the PBAS system and transmitting receipts. PBAS prevents over distribution

PPBE Process

Program Budget Accounting System (PBAS) Read More »

JCIDS Process

Joint Requirements Prioritization

Joint prioritization of capability requirements addresses statutory responsibilities of the Joint Requirements Oversight Committee (JROC) and the Command of Joint Chief of Staff (CJCS). In addition to satisfying statutory responsibilities, Joint prioritization within Joint Capability Area (JCA) portfolios provides context for decision-makers across the Department. [1] Each Functional Capabilities Board (FCB) will establish Joint priorities

JCIDS Process

Joint Requirements Prioritization Read More »

Acquisition Process

In-Service Review

  The In-Service Review (ISR) is an assessment of a system to determine if it’s operationally employed with well-understood and Managed Risks. It assesses the current status, operational health and corrective actions to satisfy user operational needs based on user feedback and performance metrics. The reviews should be conducted at defined intervals to identify needed

Acquisition Process

In-Service Review Read More »

Acquisition Process

Initial Operational Capability (IOC)

The Initial Operational Capability (IOC) is a point in time during the Production & Deployment (PD) Phase where a system can meet the minimum operational (Threshold and Objective) capabilities for a user’s stated need.  The operational capability consists of support, training, logistics, and system interoperability within the DoD operational environment.  IOC is a good gauging

Acquisition Process

Initial Operational Capability (IOC) Read More »