MDD | MS A | RFP | MS B | MS C | FRP |
Acquisition Decision Memorandum (ADM) | R | R | | R | R | R |
2366a Written Determination | | S | | | | |
2366b Certification and Determination | | | | S | S | |
Acquisition Program Baseline (APB) | | | R | S | S | S |
Acquisition Strategy | | R | R | R | R | R |
Acquisition Information Assurance Strategy | | X | | X | | |
Affordability Analysis | R | R | R | R | R | R |
Alternative Live-Fire Test and Evaluation Plan or Waiver | | | | | | |
Analysis of Alternatives (AoA) | | S | R | | R | |
Analysis of Alternatives (AoA) Study Guidance | R | | | | | |
Bandwidth Requirements Review (BRR) | | | S | S | S | |
Benefit Analysis and Determination | | S | S | | S | |
Beyond Low Rate Initial Production (LRIP) Report | | | | | | |
Business Process Re-engineering | S | S | S | S | S | |
Capability Development Document (CDD) | | R | R | | R | |
Capability Production Document (CPD) | | | | | R | |
Clinger-Cohen Act (CCA) Compliance | | S | | S | S | S |
Competitive Analysis | | | | | | |
Concept of Operations (CONOPS) | | R | | R | R | |
Contract Type Determination | | | S | S | S | |
Core Logistic/Source of Repair Analysis | | | | X | X | |
Corrosion Prevention Control Plan | | | | R | R | |
Cost Analysis Requirements Description (CARD) | | R | R | R | R | R |
Cybersecurity Strategy | | S | S | S | S | S |
Data Management Strategy | | X | | X | X | X |
Develop RFP Release Cost Estimate | | | R | | | |
DoD Component Cost Estimate | | R | | R | R | R |
DoD Component Cost Position | | R | | R | R | R |
DOT&E Report on Initial Test and Evaluation (IOT&E) | | | | | | S |
Economic Analysis | | X | | X | X | X |
Exit Criteria | | R | R | R | R | |
Frequency Allocation Application (DD Form 1494) | | S | | S | S | |
Full Funding Certification Memorandum | | R | | R | R | R |
General Equipment Validation | | | | | S | S |
Industrial Base Capabilities Consideration | | S | S | | S | |
Independent Cost Estimate (ICE) | | S | | S | S | S |
Independent Logistics Assessment | | | | S | S | S |
Independent Technology Readiness Assessment | | | | X | X | |
Information Support Plan (ISP) | | | R | | R | |
Information Technology and National Security Interoperability Certification | | | | | | R |
Initial Capabilities Document (ICD) | R | | | | | |
Initial Operational Test and Evaluation (IOT&E) Completed | | | | | | X |
Intellectual Property (IP) Strategy | | S | S | S | S | S |
Item Unique Identification (IUID) Implementation Plan | | R | R | R | R | |
Joint Interoperability Test Certification | | | | | | X |
Life-Cycle Mission Data Plan (LMDP) | | R | R | R | R | R |
Life-Cycle Sustainment Plan (LCSP) | | R | R | R | R | R |
Live-Fire Test and Evaluation Plan, Report, Waiver | | | | X | X | S |
Low-Rate Initial Production (LRIP) Quantity | | | S | S | | |
Market Research | S | S | S | | | |
Net-Centric Data & Service Strategy | | X | | X | X | |
Operational Test Agency (OTA) Report on OT&E activity | | | | | | R |
Peliminary Design Review (PDR) Report | | | | X | | |
PESHE and NEPA/E.O. 12114 Compliance Schedule | | | | S | S | S |
Post Implementation Review | | | | | | X |
Program Protection Plan (PPP) | | R | R | R | R | R |
Program Environment, Safety, & Occup Health Evaluation (PESHE) | | | | X | X | X |
Replaced System Sustainment Plan | | S | | S | | |
Selected Acquisition Report (SAR) | | | | X | | |
Should-Cost Target | | R | R | R | R | R |
Small Business Innovation Research (SBIR) | | S | S | S | S | S |
Small Business Technology Transfer (STTR) Program | | S | S | S | S | S |
Spectrum Supportability Risk Assessment/Determination | | R | | R | R | |
Systems Engineering Plan (SEP) | | R | R | R | R | |
Technical Data Rights Strategy | | X | | X | X | X |
Technology Development Strategy (TDS) | | | | | | |
Technology Readiness Assessment (TRA) | | | S | S | S | |
Technology Targeting Risk Assessment | | R | | | | |
Termination Liability Estimate | | S | S | | S | S |
Test and Evaluation Master Plan (TEMP) | | R | R | R | R | R |
Test & Evaluation Strategy (TES) | | X | | | | |
Validated On-line Life-cycle Threat (VOLT) | R | | | | | |