Acquisition Process

Full-Rate Production Decision Review (FRPDR)

The Full-Rate Production Decision Review (FRDR) is conducted at the conclusion of the Low-Rate Initial Production (LRIP) effort that authorizes entry into the Full-Rate Production (FRP) and Deployment efforts of the Production and Deployment (PD) Phase of the Defense Acquisition Process. [1]

Full-Rate Production (FRP) Contracting for economic production quantities following stabilization of the system design and validation of the production process.

The Milestone Decision Authority (MDA) will document the results of the review in an Acquisition Decision Memorandum (ADM).

AcqLinks and References:

Updated: 7/20/2021

Rank: G2

Leave a Reply