|  MDD | 
MS A | 
 RFP | 
MS B | 
MS C | 
FRP | 
|  Acquisition Decision Memorandum (ADM) | 
R | 
R | 
  | 
R | 
R | 
R | 
| 2366a Written Determination  | 
  | 
S  | 
  | 
  | 
  | 
  | 
| 2366b Certification and Determination | 
  | 
  | 
  | 
S  | 
S  | 
  | 
|  Acquisition Program Baseline (APB) | 
  | 
  | 
R | 
S | 
S | 
S | 
| Acquisition Strategy | 
  | 
R | 
R | 
R  | 
R | 
R | 
| Acquisition Information Assurance Strategy | 
  | 
X | 
  | 
X  | 
  | 
  | 
| Affordability Analysis | 
R | 
R  | 
R | 
R | 
R | 
R  | 
| Alternative Live-Fire Test and Evaluation Plan or Waiver | 
  | 
 | 
  | 
  | 
  | 
  | 
| Analysis of Alternatives (AoA) | 
  | 
S | 
R | 
  | 
R | 
  | 
| Analysis of Alternatives (AoA) Study Guidance | 
R | 
  | 
  | 
  | 
  | 
  | 
| Bandwidth Requirements Review (BRR) | 
  | 
  | 
S  | 
 S | 
S  | 
  | 
| Benefit Analysis and Determination | 
  | 
S  | 
 S | 
  | 
S  | 
  | 
| Beyond Low Rate Initial Production (LRIP) Report | 
  | 
  | 
  | 
  | 
  | 
  | 
| Business Process Re-engineering | 
 S | 
 S | 
S  | 
S  | 
S  | 
  | 
|  Capability Development Document (CDD) | 
  | 
R | 
R | 
  | 
R  | 
  | 
|  Capability Production Document (CPD) | 
  | 
  | 
  | 
  | 
R | 
  | 
|  Clinger-Cohen Act (CCA) Compliance | 
  | 
S | 
  | 
S | 
S | 
S | 
| Competitive Analysis | 
  | 
  | 
  | 
  | 
  | 
  | 
| Concept of Operations (CONOPS) | 
  | 
 R | 
  | 
 R | 
R  | 
  | 
| Contract Type Determination | 
  | 
  | 
 S | 
S  | 
S  | 
  | 
| Core Logistic/Source of Repair Analysis | 
  | 
  | 
  | 
X | 
X | 
  | 
| Corrosion Prevention Control Plan | 
  | 
  | 
  | 
R | 
R | 
  | 
|  Cost Analysis Requirements Description (CARD) | 
  | 
R | 
R  | 
R | 
R | 
R | 
| Cybersecurity Strategy | 
  | 
S | 
S  | 
S  | 
S | 
S  | 
| Data Management Strategy | 
  | 
X | 
  | 
X | 
X | 
X | 
| Develop RFP Release Cost Estimate | 
  | 
  | 
 R | 
  | 
  | 
  | 
| DoD Component Cost Estimate | 
  | 
R | 
  | 
R  | 
R  | 
R  | 
| DoD Component Cost Position | 
  | 
R  | 
  | 
R  | 
R  | 
R  | 
| DOT&E Report on Initial Test and Evaluation (IOT&E) | 
  | 
  | 
  | 
  | 
  | 
S  | 
| Economic Analysis | 
  | 
X | 
  | 
X | 
X | 
X | 
| Exit Criteria | 
  | 
R | 
R  | 
R | 
R | 
  | 
| Frequency Allocation Application (DD Form 1494) | 
  | 
 S | 
  | 
S  | 
S  | 
  | 
| Full Funding Certification Memorandum | 
  | 
R  | 
  | 
R  | 
R  | 
R | 
| General Equipment Validation | 
  | 
  | 
  | 
  | 
S  | 
 S | 
| Industrial Base Capabilities Consideration | 
  | 
 S | 
 S | 
  | 
S | 
  | 
|  Independent Cost Estimate (ICE) | 
  | 
S | 
  | 
S | 
S | 
S  | 
| Independent Logistics Assessment | 
  | 
  | 
  | 
S  | 
 S | 
S  | 
|  Independent Technology Readiness Assessment | 
  | 
  | 
  | 
X | 
X | 
  | 
| Information Support Plan (ISP) | 
  | 
  | 
 R | 
  | 
R | 
  | 
| Information Technology and National Security Interoperability Certification | 
  | 
  | 
  | 
  | 
  | 
R  | 
| Initial Capabilities Document (ICD) | 
R | 
  | 
  | 
  | 
  | 
  | 
|  Initial Operational Test and Evaluation (IOT&E) Completed | 
  | 
  | 
  | 
  | 
  | 
X | 
| Intellectual Property (IP) Strategy | 
  | 
 S | 
S  | 
S  | 
S  | 
S | 
|  Item Unique Identification (IUID) Implementation Plan | 
  | 
R | 
 R | 
R | 
R | 
  | 
| Joint Interoperability Test Certification | 
  | 
  | 
  | 
  | 
  | 
X | 
| Life-Cycle Mission Data Plan (LMDP) | 
  | 
R | 
R  | 
R | 
R | 
R  | 
| Life-Cycle Sustainment Plan (LCSP) | 
  | 
R  | 
R | 
R | 
R | 
R | 
|  Live-Fire Test and Evaluation Plan, Report, Waiver | 
  | 
  | 
  | 
X | 
X | 
S | 
| Low-Rate Initial Production (LRIP) Quantity | 
  | 
  | 
S  | 
S | 
  | 
  | 
| Market Research | 
S | 
S | 
S  | 
  | 
  | 
  | 
| Net-Centric Data & Service Strategy | 
  | 
X | 
  | 
X | 
X | 
  | 
| Operational Test Agency (OTA) Report on OT&E activity | 
  | 
  | 
  | 
  | 
  | 
R | 
| Peliminary Design Review (PDR) Report | 
  | 
  | 
  | 
X | 
  | 
  | 
| PESHE and NEPA/E.O. 12114 Compliance Schedule | 
  | 
  | 
  | 
S | 
S  | 
S  | 
| Post Implementation Review | 
  | 
  | 
  | 
  | 
  | 
X | 
|  Program Protection Plan (PPP) | 
  | 
R | 
R  | 
R | 
R | 
R  | 
| Program Environment, Safety, & Occup Health Evaluation (PESHE) | 
  | 
  | 
  | 
X | 
X | 
X | 
| Replaced System Sustainment Plan | 
  | 
S  | 
  | 
S  | 
  | 
  | 
| Selected Acquisition Report (SAR) | 
  | 
  | 
  | 
X | 
  | 
  | 
| Should-Cost Target | 
  | 
R | 
R | 
R | 
R  | 
 R | 
| Small Business Innovation Research (SBIR) | 
  | 
S  | 
S | 
S  | 
S  | 
S  | 
| Small Business Technology Transfer (STTR) Program  | 
  | 
S  | 
S | 
S  | 
S  | 
S  | 
| Spectrum Supportability Risk Assessment/Determination | 
  | 
R  | 
  | 
R | 
R | 
  | 
|  Systems Engineering Plan (SEP) | 
  | 
R | 
 R | 
R | 
R | 
  | 
| Technical Data Rights Strategy | 
  | 
X | 
  | 
X | 
X | 
X | 
|  Technology Development Strategy (TDS) | 
  | 
  | 
  | 
  | 
  | 
  | 
|  Technology Readiness Assessment (TRA) | 
  | 
  | 
S | 
S | 
S | 
  | 
| Technology Targeting Risk Assessment | 
  | 
R  | 
  | 
  | 
  | 
  | 
| Termination Liability Estimate | 
  | 
 S | 
S | 
  | 
S  | 
S  | 
|  Test and Evaluation Master Plan (TEMP) | 
  | 
 R | 
R  | 
R | 
R | 
R | 
| Test & Evaluation Strategy (TES) | 
  | 
X | 
  | 
  | 
  | 
  | 
| Validated On-line Life-cycle Threat (VOLT) | 
R  | 
  | 
  | 
  | 
  | 
  |