Search Results for: 2

Requirements Development

Functional Analysis and Allocation

Functional Analysis and Allocation is a top-down process of translating system level requirements into detailed functional and performance design criteria. The result of the process is a defined Functional Architecture with allocated system requirements that are traceable to each system function. SMC Systems Engineering Handbook – Figure15: Functional Analyss and Allocation The Functional Analysis and […]

Requirements Development

Functional Analysis and Allocation Read More »

Requirements Development

Functional Area Analysis (FAA)

The Functional Area Analysis (FAA) identifies the operational tasks, conditions, and standards needed to achieve military objectives. The FAA uses the national strategies (National Military Strategy, National Defense Strategy, National Security Strategy), the Family of Joint Future Concepts, and other assigned missions to arrive at a prioritized list of capabilities and tasks that must be

Requirements Development

Functional Area Analysis (FAA) Read More »

Earned Value Management

Cost and Software Data Reporting

The Cost and Software Data Reporting (CSDR) system is the primary means that DoD uses to collect actual cost and related business data on Acquisition Category (ACAT) I and ACAT IA defense contracts. Program Managers (PM) use the CSDR system to report data on contractor development and production costs and resource usage incurred in performing

Earned Value Management

Cost and Software Data Reporting Read More »

Requirements Development

Design Synthesis

Design Synthesis is the process of taken the functional architecture developed in the Functional Analysis and Allocation step and decomposing those functions into a Physical Architecture (a set of product, system, and/or software elements) that satisfy system required functions. SMC Systems Engineering Handbook, Figure 17 Synthesis is the process whereby the Functional Architectures and their

Requirements Development

Design Synthesis Read More »

Proposal Development

Contract Funds Status Report (CFSR)

The Contract Funds Status Report (CFSR) supplies funding data about defense contracts to government Program Managers (PM). The data is provided on DD Form 1586. Contracts over 6 months in duration and $1.5 million dollars are required to have a CFSR. Data provided to the PM from the contractor include: Updating and forecasting contract funds

Proposal Development

Contract Funds Status Report (CFSR) Read More »

Proposal Development

Deriving Electronic Requirements

Derived Requirement are requirements that are not explicitly stated in the set of Stakeholder requirements, and yet is required to satisfy one or more of them. The specific requirements for an electronic device will be derived from the system requirements, safety analyses, system architecture, performance requirements, and the operational environment. The objectives of the requirements

Proposal Development

Deriving Electronic Requirements Read More »

Earned Value Management

Contractor EVMS Validation Plan

A contractor Earned Value Management System (EVMS) Validation Plan is required by DFARS Subpart 252.234-7001 and requires that a contractor be prepared to demonstrate that the contractor’s EVMS meets the guidelines set fort in ANSI/EIA-748.  The contractor should prepare a plan to achieve validation and submit the plan as part of the proposal.  The plan shall:

Earned Value Management

Contractor EVMS Validation Plan Read More »

Earned Value Management

Budgeted Cost of Work Performed (BCWP)

The Budgeted Cost of Work Performed (BCWP) is the budgeted cost (Dollars) of the value of work that has actually been accomplished or completed to date. It can be used to address the entire project, individual task, or work packages. It’s compared against the Actual Cost of Work Performed (ACWP).  BCWP is a tool used

Earned Value Management

Budgeted Cost of Work Performed (BCWP) Read More »

Requirements Development

Capability Production Document (CPD)

The Capability Production Document (CPD) captures the information necessary to support production, testing, and deployment of an affordable and supportable increment within an acquisition strategy. The CPD identifies, in threshold/objective format, the specific attributes that contribute most significantly to the desired full operational capability of a system. The CPD is prepared during the Engineering &

Requirements Development

Capability Production Document (CPD) Read More »