Cost Estimating

Average Procurement Unit Cost (APUC)

Average Procurement Unit Cost (APUC) is calculated by dividing total procurement cost by the number of articles to be procured. Total procurement cost includes flyaway, rollaway, sail away from the cost (that is, recurring and nonrecurring costs associated with the production of the item such as hardware/software, Systems Engineering (SE), engineering changes, and warranties) plus […]

Cost Estimating

Average Procurement Unit Cost (APUC) Read More »

Cost Estimating

Actual Cost Estimating

Actual Cost Estimating is a technique where actual cost experience or trends (from prototypes, engineering development models, and/or early production items) are used to project estimates of future costs for the same system. These projections may be made at various levels of detail, depending on the availability of data. Cost estimates that support Full-Rate Production

Cost Estimating

Actual Cost Estimating Read More »

Cost Estimating

Step 9 Conduct Risk and Uncertainly Analysis

Step 9 “Conduct Risk and Uncertainty Analysis” on the point estimate developed in Step 7 “Develop Point Estimate and Compare it to an Independent Cost Estimate”. This analysis will expand on the sensitivity analysis that was conducted in Step 8 “Conduct Sensitivity Analysis”. Risk and uncertainty refer to the fact that because a cost estimate

Cost Estimating

Step 9 Conduct Risk and Uncertainly Analysis Read More »

Cost Estimating

Step 11 Present Estimate to Management for Approval

A cost estimate is not considered valid until management has approved it. Since many cost estimates are developed to support a budget request or make a decision between competing alternatives, it is vital that management is briefed on how the estimate was developed, including risks associated with the underlying data and methods. Therefore, the cost

Cost Estimating

Step 11 Present Estimate to Management for Approval Read More »

Cost Estimating

Step 8 Conduct Sensitivity Analysis

Step 8 “Conduct Sensitivity Analysis” should be included in all cost estimates because it examines the effects of changing assumptions and ground rules. Since uncertainty cannot be avoided, it is necessary to identify the cost elements that represent the most risk and, if possible, cost estimators should quantify the risk. This can be done through

Cost Estimating

Step 8 Conduct Sensitivity Analysis Read More »

Cost Estimating

Step 5 Identify Ground Rules and Assumptions

Step 5 “Identify Ground Rules and Assumptions”. Cost estimates are typically based on limited information and therefore need to be bound by the constraints that make estimating possible. These constraints usually take the form of assumptions that bind the estimate’s scope, establishing baseline conditions the estimate will be built from. Because of the many unknowns,

Cost Estimating

Step 5 Identify Ground Rules and Assumptions Read More »

Cost Estimating

Step 7 Develop Point Estimate and Compare it to an Independent Cost Estimate

Step 7 “Develop Point Estimate and Compare it to an Independent Cost Estimate” pulls all the information together to develop the point estimate; the best guess at the cost estimate, given the underlying data. High-quality cost estimates usually fall within a range of possible costs, the point estimate being between the best and worst case

Cost Estimating

Step 7 Develop Point Estimate and Compare it to an Independent Cost Estimate Read More »