Cost Estimating

Manpower Estimates

Note: Manpower estimates are no longer required by DoD Instruction 5000.02 as a milestone deliverable. From DoD Instruction 5000.02: In advance of contracting for operational support services, the Program Manager will, in conjunction with the designated DoD Component manpower authority, determine the most efficient and cost-effective mix of DoD manpower and contract support. The mix of military, DoD civilian, and […]

Cost Estimating

Manpower Estimates Read More »

Cost Estimating

Engineering Cost Estimating

The Engineering Cost Estimating method (Also called Bottoms-Up) builds the overall cost estimate by summing detailed estimates done at lower levels of the Work Breakdown Structure (WBS). It’s a technique where the system being costed is broken down into lower-level components (such as parts or assemblies), each of which is costed separately for direct labor,

Cost Estimating

Engineering Cost Estimating Read More »

Cost Estimating

Cost Estimates for Milestone A Reviews

A cost estimate for a proposed materiel solution(s) is submitted at Milestone A.  Also, the Director of Cost Assessment and Program Evaluation (DCAPE) conducts an Independent Cost Estimate (ICE) in advance of Milestone A certification. In order to facilitate these estimates, the cost estimating procedures at Milestone A will track those at the other milestone

Cost Estimating

Cost Estimates for Milestone A Reviews Read More »

Cost Estimating

Component Cost Estimate

The generic term “DoD Component Cost Estimate” is used to provide considerable latitude to each military service or defense agency as to the actual responsibility for this cost estimate. In some cases, a military service assigns the responsibility to the Program Management Office (PMO), which then provides a Program Office Life-Cycle Cost Estimate (PLCCE). In

Cost Estimating

Component Cost Estimate Read More »