Search Results for: 2

Risk & Safety Management

Element 8: Manage Life Cycle Risk

Element 8 “Manage Life-Cycle Risk”. After the system is fielded, the system program office uses the system safety process to identify hazards and maintain the Hazard Tracking System (HTS) throughout the system’s life-cycle. This life-cycle effort considers any changes to include, but not limited to, the interfaces, users, hardware and software, mishap data, mission(s) or […]

Risk & Safety Management

Element 8: Manage Life Cycle Risk Read More »

Risk & Safety Management

Element 5: Reduce Risk

  Element 5 “Reduce Risk” is where Mitigation measures are selected and implemented to achieve an acceptable risk level. Consider and evaluate the cost, feasibility, and effectiveness of candidate mitigation methods as part of the Systems Engineering process and Integrated Product Team (IPT) processes. Present the current hazards, their associated severity and probability assessments, and

Risk & Safety Management

Element 5: Reduce Risk Read More »

Risk & Safety Management

Element 4: Identify and Document Risk Mitigation Measures

Element 4 “Identify and document risk mitigation measures” is where risk mitigation(s) is identified, and the expected risk reduction(s) of the alternative(s) shall be estimated and documented in the Hazard Tracking System (HTS). The goal should always be to eliminate the hazard if possible. When a hazard cannot be eliminated, the associated risk should be

Risk & Safety Management

Element 4: Identify and Document Risk Mitigation Measures Read More »

Risk & Safety Management

Element 1: Document the System Safety Process

  Element 1 “Document the system safety approach” is where the Program Manager (PM) and contractor document the system safety approach for managing hazards as an integral part of the Systems Engineering Process.   MIL-STD-882E “Standard Practice for System Safety” – Page 10   The approach should describe the risk management effort and how the

Risk & Safety Management

Element 1: Document the System Safety Process Read More »

Risk & Safety Management

Element 3: Assess and Document Risk

Element 3 “Assess and document risk” documents the severity category and probability level for a potential mishap(s) for each hazard.  Each risk is assessed using the definitions in Tables 1 and Table 2 below from MIL-STD-882E. Standard: MIL-STD-882E “Standard Practice for System Safety” – Page 10 Severity Category To determine the appropriate severity category as

Risk & Safety Management

Element 3: Assess and Document Risk Read More »

Risk & Safety Management

Risk Tracking

Risk Tracking (sometimes referred to as Risk Monitoring) is an activity of systematically tracking and evaluating the performance of risk mitigation actions against established metrics throughout the acquisition process and develops further risk mitigation options or executes risk mitigation plans, as appropriate. Its intent is to ensure successful Risk Mitigation and should be done as

Risk & Safety Management

Risk Tracking Read More »

Risk & Safety Management

System Safety Process

System Safety is the application of engineering and management principles, criteria, and techniques to achieve acceptable risk within the constraints of operational effectiveness and suitability, schedule, and cost throughout the system’s lifecycle. System safety covers the entire spectrum of Environment, Safety, and Occupational Health (ESOH) considerations. It is an integral part of the Systems Engineering (SE) process

Risk & Safety Management

System Safety Process Read More »

Risk & Safety Management

Risk Mitigation Planning

Risk Mitigation (it used to be called Risk Handling) is the process that identifies, evaluates, selects, and implements options in order to set risk at acceptable levels given program constraints and objectives. This includes the specifics on what should be done, when it should be accomplished, who is responsible, and associated cost and schedule. Definition:

Risk & Safety Management

Risk Mitigation Planning Read More »

Risk & Safety Management

Risk Mitigation Plan Implementation

A Risk Mitigation Plan Implementation is meant to ensure successful Risk Mitigation occurs and is based upon a program Risk Mitigation Plan (RMP). It should: [1] Determines what planning, budget, and requirements and contractual changes are needed, Provides a coordination vehicle with management and other stakeholders, Directs the teams to execute the defined and approved

Risk & Safety Management

Risk Mitigation Plan Implementation Read More »