Search Results for: 2

JCIDS Process

Joint Operations Concepts (JOpsC)

  Joint Operations Concepts (JOpsC) is a family of joint future concepts consisting of a Capstone Concept for Joint Operations (CCJO), Joint Operating Concepts (JOC), Joint Functional Concepts (JFC), and Joint Integrating Concepts (JIC). The objective of JOpsC is to guide the transformation of the joint force so that it is prepared to operate successfully […]

JCIDS Process

Joint Operations Concepts (JOpsC) Read More »

PPBE Process

Guidance of the Development Employment of Force

Update: The GDF and Joint Programming Guidance (JPG) have been combined and been replaced by the Defense Programming and Planning Guidance (DPPG) [2] Guidance for Development of the Force (GDF) GDF establishes the DoD’s force development planning and resource priorities needed to meet future contingencies. The GDF is issued early in the planning process to

PPBE Process

Guidance of the Development Employment of Force Read More »

Acquisition Process

Selected Acquisition Report (SAR)

A Selected Acquisition Report (SAR) is a comprehensive summary of a Major Defense Acquisition Program (MDAP) Acquisition Category (ACAT) I program that is required for periodic submission to Congress by the Secretary of Defense. It’s mandated by Title 10 USC § 2432 “Selected Acquisition Reports”. Selected Acquisition Report (SAR) Database The following website contains a

Acquisition Process

Selected Acquisition Report (SAR) Read More »

JCIDS Process

Systems Engineering Plan (SEP)

The Systems Engineering Plan (SEP) is a living document that details the execution, management, and control of the technical aspects of an acquisition program from conception to disposal. The SEP outlines how the systems engineering process is applied and tailored to meet objectives for each acquisition phase. The SEP captures a program’s current and evolving

JCIDS Process

Systems Engineering Plan (SEP) Read More »

Acquisition Process

Flight Readiness Review (FRR)

A Flight Readiness Review (FRR) is a sub-set of the Test Readiness Review (TRR) and is applicable only to aviation programs. It assesses the readiness to initiate and conduct flight tests or flight operations. Typically, FRR approval requires the aviation system to be under Configuration Management (CM), have a flight clearance issued by the technical

Acquisition Process

Flight Readiness Review (FRR) Read More »

Acquisition Process

Integrated Baseline Review (IBR)

An Integrated Baseline Review (IBR) (FAR 34.202)is a joint assessment conducted by the government Program Manager (PM) and the contractor to establish a mutual understanding of the Performance Measurement Baseline (PMB). This understanding provides for an agreement on a plan of action to evaluate the risks inherent in the PMB and the management processes that

Acquisition Process

Integrated Baseline Review (IBR) Read More »

Acquisition Process

System Verification Review (SVR)

  The System Verification Review (SVR) is a product and process assessment to ensure the system under review can proceed into Low-Rate Initial Production (LRIP) and Full-Rate Production (FRP) within cost, schedule, risk, and other system constraints during the Engineering, Manufacturing and Development (EMD) Phase.  It assesses the system functionality and determines if it meets

Acquisition Process

System Verification Review (SVR) Read More »

Acquisition Process

Preliminary Design Review (PDR)

The Preliminary Design Review (PDR) is a technical assessment that establishes the Allocated Baseline of a system to ensure a system is operationally effective.  A PDR is conducted before the start of detailed design work and is the first opportunity for the Government to observe the Contractor’s hardware and software design closely.  This review assesses

Acquisition Process

Preliminary Design Review (PDR) Read More »

PPBE Process

Unit Cost Report (UCR)

The Unit Cost Report (UCR) was established to satisfy congressional requirements for standardized information to control the unit cost growth of Major Defense Acquisition Programs (MDAP). It includes Program Acquisition Unit Cost (PAUC) and Average Procurement Unit Cost (APUC) in program base year dollars, major contract information, and Acquisition Program Baseline (APB) schedule and performance

PPBE Process

Unit Cost Report (UCR) Read More »

Acquisition Process

Operational Test Readiness Review

The Operational Test Readiness Review (OTRR) assesses if a system should proceed into Initial Operational Test and Evaluation (IOT&E).  The review addresses and verifies system reliability, maintainability, and supportability performance and determines if the hazards and Environmental, Safety, Occupational, and Health (ESOH) residual risks are manageable within the planned testing operations.  This assessment determines if

Acquisition Process

Operational Test Readiness Review Read More »